| TAKAISIN

VINTERTEC VM 15 T/P 2004 – 2005 SKI TOW
skilift directive EN 2000/9/EC
World’s first skilift driven by frequence convertec and new module
double digital safety circuit certified to the new European regulations
EN 2000/9/EC
New easy to operate and install moduletype skilift Vintertec VM 15 using
platter or telescope towing units.
Skilift can be installed
on a profiles 50 – 500 meters.
Terminals are adjustable as even tower crossings for different line height.
Foundation solutions
are traditional concrete or fastfix all steel foundation.
Skilifts can be delivered on one lorry including steel foundations and
operation building.
The skilift is operated
by ABB ACS 800 Ski Tow unit including a double safety circuit.
Operation speed variable 0 – 2,2 m/s
Capacity 300 – 900 persons/hour

|